
NOSi strengthens energy transition with photovoltaic system at State Data Center
NOSi, the agency that runs Cabo Verde's state data centre in Praia, switched on a photovoltaic generation system at the facility at a ceremony at the Technology Park on 16 February 2026. Its executive administrator framed it as a step toward energy autonomy and resilience under the ESG strategy NOSi adopted in 2024. No capacity, cost or share of the site's load covered by solar was published.
- Power Infrastructure
