
Paratus and Powertel light up first phase of major Zimbabwe fiber corridor
Paratus Zimbabwe and Powertel Communications have lit the first phase of a DWDM fibre route between Plumtree and Bulawayo, carrying 800Gbps initially and scalable beyond 10Tbps. The route, built under a June 2025 public-private partnership, is meant to link Zimbabwe with Botswana, Zambia and South Africa, with the Bulawayo to Livingstone leg expected by September 2026. Powertel keeps ownership while Paratus uses the capacity under an IRU.
- Connectivity & Fibre
