Togo scores 53/100 (Grade C), ranking 28th of 54 African markets and unchanged since Jul 2026. Its strongest pillar is Currency & GDP at 66 of 100, with no pillar rated green. Its largest drag is Power Infrastructure, at 43 of 100.
Each pillar carries its own strength out of 100, banded red, amber or green. Arrows mark movement since the previous snapshot.
The composite out of 100 is the weighted sum of these five pillars. A pillar’s figure is its own strength out of 100, measured against the most that pillar could contribute, which is what the red, amber and green bands read against. Full pillar weighting is available to institutions under NDA: request a briefing. Full method
Coverage and digital success stories for Togo, newest first. Stories published elsewhere link out to the publisher. Everything here is qualitative context; none of it affects the grade.
Wholesale infrastructure firm CSquared said on 13 July 2026 that it has activated capacity on the 2Africa West subsea cable, adding a route alongside its Equiano capacity, which lands in Nigeria and Togo. Its terrestrial backbone carries traffic from landing points such as Accra, Lagos and Abidjan inland to Burkina Faso, Mali, Guinea, Sierra Leone and Liberia. The move follows cable cuts off Cote d'Ivoire in March 2024 and again in June 2026 that disrupted connectivity across the region. No capacity figure was disclosed.
Togo's state-owned Société d'Infrastructures Numériques (SIN) has partnered with ST Digital to sell private cloud and AI services from the Lomé Data Centre, keeping local companies' data hosted and processed in Togo. The site holds Uptime Institute Tier III certification and reports 99.982% availability. SIN says the offer is meant to reach smaller clients that cannot afford even half a rack, and the partners plan continuing training for local staff.
CSquared and its Togolese joint venture CSquared Woezon, with Nigerian operator Phase3 and Benin's state infrastructure company SBIN, have commissioned a terrestrial fibre route from Lagos to Accra that crosses Benin and Togo, with a quoted latency of 11ms between the two cities. The partners present it as an overland alternative to the coastal subsea cables after the March 2024 seabed rockfall that cut several systems and disrupted service for an estimated 300 million people. Route length and capacity were not disclosed, and the ready-for-service date was left to be announced.
Togo ranks 7th of 16 markets in West Africa, all scored on the same five pillars. Move a pillar to see where it would land.
Each axis is a pillar as a share of its own maximum, so a balanced market reads as a regular pentagon and a lopsided one as a spike. Hover a point for the exact figure.
Composite readiness across the last six snapshots. Every snapshot is rescored under the current methodology (v1), so points are comparable even as weights evolve.
| Snapshot | Score | Grade |
|---|---|---|
| Jan 2024 | 52 | C · Emerging Opportunity |
| Jul 2024 | 52 | C · Emerging Opportunity |
| Jan 2025 | 52 | C · Emerging Opportunity |
| Jul 2025 | 52 | C · Emerging Opportunity |
| Jan 2026 | 52 | C · Emerging Opportunity |
| Jul 2026 | 53 | C · Emerging Opportunity |
| Aug 2026 | 53 | C · Emerging Opportunity |