Benin scores 48/100 (Grade D), ranking 36th of 54 African markets and unchanged since Jul 2026. Its strongest pillar is Currency & GDP at 66 of 100, with no pillar rated green. Its largest drag is Market Demand, at 31 of 100.
Each pillar carries its own strength out of 100, banded red, amber or green. Arrows mark movement since the previous snapshot.
The composite out of 100 is the weighted sum of these five pillars. A pillar’s figure is its own strength out of 100, measured against the most that pillar could contribute, which is what the red, amber and green bands read against. Full pillar weighting is available to institutions under NDA: request a briefing. Full method
Coverage and digital success stories for Benin, newest first. Stories published elsewhere link out to the publisher. Everything here is qualitative context; none of it affects the grade.
Wholesale infrastructure firm CSquared said on 13 July 2026 that it has activated capacity on the 2Africa West subsea cable, adding a route alongside its Equiano capacity, which lands in Nigeria and Togo. Its terrestrial backbone carries traffic from landing points such as Accra, Lagos and Abidjan inland to Burkina Faso, Mali, Guinea, Sierra Leone and Liberia. The move follows cable cuts off Cote d'Ivoire in March 2024 and again in June 2026 that disrupted connectivity across the region. No capacity figure was disclosed.
ARCEP Bénin's 2025 annual report shows the aerial FTTH distribution network growing from 2,079km to 3,266km in a year, with fixed internet subscriptions rising 163.51% to 105,715, of which 95,354 (90.2%) are fibre to the home. State operator SBIN invested 35.880bn FCFA across fixed and mobile networks in 2025, and the wholesale capacity market grew 46.8% to 18.266bn FCFA. The base is still tiny: fixed internet reaches 0.80% of roughly 13 million people, against 64.9% mobile internet penetration.
The African Development Bank has approved a $200 million loan for Nigeria's Project Bridge, part of an $800 million sovereign package that also includes $500 million from the World Bank and $100 million from the EBRD. The project aims to lay 90,000km of open-access fibre, taking the national backbone from about 30,000km to about 120,000km, reach all 774 local government areas and build cross-border links to Benin, Cameroon, Niger and Chad. The bank says design criteria favour hybrid and renewable power for resilience.
Benin ranks 9th of 16 markets in West Africa, all scored on the same five pillars. Move a pillar to see where it would land.
Each axis is a pillar as a share of its own maximum, so a balanced market reads as a regular pentagon and a lopsided one as a spike. Hover a point for the exact figure.
Composite readiness across the last six snapshots. Every snapshot is rescored under the current methodology (v1), so points are comparable even as weights evolve.
| Snapshot | Score | Grade |
|---|---|---|
| Jan 2024 | 47 | D · Selective Investment Case |
| Jul 2024 | 47 | D · Selective Investment Case |
| Jan 2025 | 48 | D · Selective Investment Case |
| Jul 2025 | 48 | D · Selective Investment Case |
| Jan 2026 | 48 | D · Selective Investment Case |
| Jul 2026 | 48 | D · Selective Investment Case |
| Aug 2026 | 48 | D · Selective Investment Case |