Sudan scores 47/100 (Grade D), ranking 37th of 54 African markets and unchanged since Jul 2026. Its strongest pillar is Power Infrastructure at 59 of 100, with no pillar rated green. Its largest drag is Currency & GDP, at 33 of 100.
Each pillar carries its own strength out of 100, banded red, amber or green. Arrows mark movement since the previous snapshot.
The composite out of 100 is the weighted sum of these five pillars. A pillar’s figure is its own strength out of 100, measured against the most that pillar could contribute, which is what the red, amber and green bands read against. Full pillar weighting is available to institutions under NDA: request a briefing. Full method
Coverage and digital success stories for Sudan, newest first. Stories published elsewhere link out to the publisher. Everything here is qualitative context; none of it affects the grade.
Ethio Telecom, Djibouti Telecom and Sudatel are moving the Horizon Fibre terrestrial corridor toward commercial launch after a stakeholder meeting in Addis Ababa attended by Google, Meta, Microsoft, AWS, Airtel Africa, WIOCC, China Mobile International and others. The multi-terabit route links subsea landing stations in Djibouti and Port Sudan through Ethiopia, offering carriers and hyperscalers an overland alternative to the Red Sea path. Ciena, Nokia and BringCom are advising on the architecture; route length and a build timeline were not given.
Ethio telecom, Djibouti Telecom and Sudatel Group signed a tripartite agreement under the Horizon Fiber Initiative for a multi-terabit terrestrial corridor from Djibouti's subsea landing stations through Ethiopia to Sudan's landing stations. It follows a December 2024 MoU and is pitched as added resilience and international bandwidth for cloud and hyperscale traffic. No capacity, cost or completion date was disclosed.
The war has left Sudan's international data traffic running mainly through subsea cables near Port Sudan, with satellite links as emergency backup. Sudani's deputy director general said the operator lost three data transformers, the Tier-4 data centre that hosted state systems, and the Abu Haraz satellite station, at a cost above $70m, though its core data centre has been restored. Engineers cite power shortages, insecurity and scarce spare parts.
Each axis is a pillar as a share of its own maximum, so a balanced market reads as a regular pentagon and a lopsided one as a spike. Hover a point for the exact figure.
Composite readiness across the last six snapshots. Every snapshot is rescored under the current methodology (v1), so points are comparable even as weights evolve.
| Snapshot | Score | Grade |
|---|---|---|
| Jan 2024 | 45 | D · Selective Investment Case |
| Jul 2024 | 45 | D · Selective Investment Case |
| Jan 2025 | 45 | D · Selective Investment Case |
| Jul 2025 | 46 | D · Selective Investment Case |
| Jan 2026 | 47 | D · Selective Investment Case |
| Jul 2026 | 47 | D · Selective Investment Case |
| Aug 2026 | 47 | D · Selective Investment Case |