Algeria scores 65/100 (Grade B), ranking 9th of 54 African markets and unchanged since Jul 2026. Its strongest pillar is Power Infrastructure at 95 of 100, with one of five pillars rated green. Its largest drag is Investment Climate, at 40 of 100.
Each pillar carries its own strength out of 100, banded red, amber or green. Arrows mark movement since the previous snapshot.
The composite out of 100 is the weighted sum of these five pillars. A pillar’s figure is its own strength out of 100, measured against the most that pillar could contribute, which is what the red, amber and green bands read against. Full pillar weighting is available to institutions under NDA: request a briefing. Full method
Coverage and digital success stories for Algeria, newest first. Stories published elsewhere link out to the publisher. Everything here is qualitative context; none of it affects the grade.
Algeria's post and telecommunications minister laid the foundation stone for a government-owned AI data centre in the Akid Lotfi district of Oran. No capacity or cost figures were released; the facility is meant to give researchers, startups and universities access to AI compute. The government says it expects AI to contribute 7% of GDP by 2027.
Niger was set to open its fibre link with Algeria on 5 October 2026 at Assamaka on the border, giving the landlocked country a northern route onto Algerian international capacity along the Agadez to Assamaka corridor of the Trans-Saharan backbone. Niger's share of the backbone is 1,031km on five routes plus an 88km urban loop connecting government sites to a planned Tier III national data centre. Its existing southern path through Benin reaches three subsea systems with about 580 Gbit/s of combined installed capacity at end-2024.
Algeria Telecom and Niger Telecom signed agreements in Niamey on 8 September 2026 for a 100Gb terrestrial link between In Guezzam and Agadez, with Algeria donating the transmission equipment, as part of the Trans-Saharan backbone that also targets Nigeria, Chad, Mali and Mauritania. The telling figure is on the compute side: according to Niger's digital economy minister, the backbone was 97% built at the start of 2026, but the national data centre attached to the same project was only 8% complete. The Niger fibre segment received provisional acceptance in November 2025; no financing figures were given.
Each axis is a pillar as a share of its own maximum, so a balanced market reads as a regular pentagon and a lopsided one as a spike. Hover a point for the exact figure.
Composite readiness across the last six snapshots. Every snapshot is rescored under the current methodology (v1), so points are comparable even as weights evolve.
| Snapshot | Score | Grade |
|---|---|---|
| Jan 2024 | 62 | C · Emerging Opportunity |
| Jul 2024 | 63 | C · Emerging Opportunity |
| Jan 2025 | 64 | C · Emerging Opportunity |
| Jul 2025 | 63 | C · Emerging Opportunity |
| Jan 2026 | 64 | C · Emerging Opportunity |
| Jul 2026 | 65 | B · Attractive Investment Market |
| Aug 2026 | 65 | B · Attractive Investment Market |