Liberia scores 46/100 (Grade D), ranking 39th of 54 African markets and unchanged since Jul 2026. Its strongest pillar is Investment Climate at 75 of 100, with one of five pillars rated green. Its largest drag is Power Infrastructure, at 31 of 100.
Each pillar carries its own strength out of 100, banded red, amber or green. Arrows mark movement since the previous snapshot.
The composite out of 100 is the weighted sum of these five pillars. A pillar’s figure is its own strength out of 100, measured against the most that pillar could contribute, which is what the red, amber and green bands read against. Full pillar weighting is available to institutions under NDA: request a briefing. Full method
Coverage and digital success stories for Liberia, newest first. Stories published elsewhere link out to the publisher. Everything here is qualitative context; none of it affects the grade.
Liberia is looking for investors in a national data centre, which it pitched at a recent investor dialogue in New York, but participants questioned whether the grid can power it. The country had 126MW of installed generation in 2024, about 70% of it hydro, and 32.5% electricity access per World Bank data, and Mount Coffee output falls in the dry season. Posts and Telecommunications Minister Sekou M. Kromah said feasibility studies will set the approach; no site or investment model has been chosen.
Wholesale infrastructure firm CSquared said on 13 July 2026 that it has activated capacity on the 2Africa West subsea cable, adding a route alongside its Equiano capacity, which lands in Nigeria and Togo. Its terrestrial backbone carries traffic from landing points such as Accra, Lagos and Abidjan inland to Burkina Faso, Mali, Guinea, Sierra Leone and Liberia. The move follows cable cuts off Cote d'Ivoire in March 2024 and again in June 2026 that disrupted connectivity across the region. No capacity figure was disclosed.
The ECOWAS Commission hosted delegates from The Gambia, Guinea, Guinea-Bissau, Liberia and Sierra Leone in Abuja from 29 June to 10 July 2026 to evaluate bids for submarine cable capacity. The procurement is a step toward a World Bank-funded second cable under WARDIP, meant to give the five countries a redundant route beyond their current single cable. Bidders and contract values were not disclosed.
Liberia ranks 11th of 16 markets in West Africa, all scored on the same five pillars. Move a pillar to see where it would land.
Each axis is a pillar as a share of its own maximum, so a balanced market reads as a regular pentagon and a lopsided one as a spike. Hover a point for the exact figure.
Composite readiness across the last six snapshots. Every snapshot is rescored under the current methodology (v1), so points are comparable even as weights evolve.
| Snapshot | Score | Grade |
|---|---|---|
| Jan 2024 | 45 | D · Selective Investment Case |
| Jul 2024 | 46 | D · Selective Investment Case |
| Jan 2025 | 46 | D · Selective Investment Case |
| Jul 2025 | 45 | D · Selective Investment Case |
| Jan 2026 | 45 | D · Selective Investment Case |
| Jul 2026 | 46 | D · Selective Investment Case |
| Aug 2026 | 46 | D · Selective Investment Case |