Congo (DRC) scores 45/100 (Grade D), ranking 42nd of 54 African markets and unchanged since Jul 2026. Its strongest pillar is Market Demand at 82 of 100, with one of five pillars rated green. Its largest drag is Power Infrastructure, at 29 of 100.
Each pillar carries its own strength out of 100, banded red, amber or green. Arrows mark movement since the previous snapshot.
The composite out of 100 is the weighted sum of these five pillars. A pillar’s figure is its own strength out of 100, measured against the most that pillar could contribute, which is what the red, amber and green bands read against. Full pillar weighting is available to institutions under NDA: request a briefing. Full method
Coverage and digital success stories for Congo (DRC), newest first. Stories published elsewhere link out to the publisher. Everything here is qualitative context; none of it affects the grade.
On 8 October 2026 the Central African Republic revived a plan to connect to DR Congo's fibre, which runs about 650 km from Kinshasa to the WACS landing at Moanda, to reduce its reliance on routes through Cameroon and Congo. Route, cost and timeline were not given. CAR's 935 km national backbone dates from February 2023, and internet penetration was about 12% at end 2025.
KINIX, the Kinshasa internet exchange run by ISPA-DRC, has added the Tier III Raxio DRC facility alongside OADC's FIH1, making it a two-site exchange. It counts 23 networks over 25 connections, including all four Congolese mobile operators plus Meta and Cloudflare, and moves more than 1 Tbps, which it expects to pass 2 Tbps after the Raxio deployment. Operators from outside the DRC already peer there as KINIX positions itself as a Central African hub.
The DRC telecoms ministry signed an MoU with China's Genew Technologies for about 1,700 km of fibre laid along the Congo River from Muanda to Kisangani, plus some 400 km of land connections. Genew's CEO puts the total at US$1.5bn, with more than US$400m needed for the first phase. No financing structure or implementation timeline has been disclosed.
Congo (DRC) ranks 7th of 9 markets in Central Africa, all scored on the same five pillars. Move a pillar to see where it would land.
Each axis is a pillar as a share of its own maximum, so a balanced market reads as a regular pentagon and a lopsided one as a spike. Hover a point for the exact figure.
Composite readiness across the last six snapshots. Every snapshot is rescored under the current methodology (v1), so points are comparable even as weights evolve.
| Snapshot | Score | Grade |
|---|---|---|
| Jan 2024 | 42 | D · Selective Investment Case |
| Jul 2024 | 43 | D · Selective Investment Case |
| Jan 2025 | 42 | D · Selective Investment Case |
| Jul 2025 | 43 | D · Selective Investment Case |
| Jan 2026 | 45 | D · Selective Investment Case |
| Jul 2026 | 45 | D · Selective Investment Case |
| Aug 2026 | 45 | D · Selective Investment Case |